相关文章
Related Articles详细介绍
一、用途:
1. Use:
ZJC-100E
电压击穿试验仪|电气强度测试仪由电脑控制,数据采集方式通过光电隔离,有效解决试验过程中的抗干扰问题,软件操作使用方便,能够实时显示动态曲线,同时升压速率无级可调,可以根据自己的需要进行升压速率调节,调节范围在0.1KV-3KV/S,使升压速率真正做到匀速、准确,并能够准确测出漏电电流的数据。电压击穿试验仪|电气强度测试仪可实时绘制试验曲线,显示试验数据,判断准确,并可保存,分析,打印试验数据。并且能够自动判别试样击穿并采集击穿电压数据及泄露电流,同时能够在击穿的瞬间电压迅速降低自动归零。软件统操作方便,性能稳定,安全可靠。
ZJC-100KV voltage breakdown testing instrument controlled by computer, data acquisition method by photoelectric isolation, effectively solve the interference problem in the test process, the software has the advantages of convenient operation, can display the dynamic curve, while the pressure rate can be adjusted, can according to their own needs to boost rate adjustment, adjustment in the range of 0.1KV-3KV/S, so that the pressure rate truly uniform and accurate, and can accurately measure the leakage current data. The test curve can be drawn in real time, the test data is displayed, the judgment is accurate, and the test data can be saved, analyzed and printed. It can automatically distinguish the breakdown of the sample and collect the breakdown voltage data and the leakage current, at the same time, it can quickly reduce the automatic zero return at the instant of the breakdown voltage. The software system is easy to operate, stable in performance, and safe and reliable.
二、符合标准:
Two. Conform to the standard:
1、GB1408.1-2006《绝缘材料电气强度试验方法》
1, GB1408.1-2006 "test method for electrical strength of insulating materials"
2、GB1408.2-2006《绝缘材料电气强度试验方法
2, "GB1408.2-2006 electrical strength of insulating materials test methods
第2部分:对应用直流电压试验的附加要求》
Part second: Additional requirements for tests using direct voltage "
3、GB/T1695-2005《硫化橡胶工频击穿电压强度和耐电压的测定方法》
3, GB/T1695-2005 "determination method of voltage strength and voltage resistance of vulcanized rubber working frequency breakdown voltage"
4、ASTM D149《固体电绝缘材料工业电源频率下的介电击穿电压和介电强度的试验方法》
4, ASTM D149 "test method for dielectric breakdown voltage and dielectric strength of solid electrical insulation materials in industrial power supply frequency"
三、主要技术要求:
Three. The main technical requirements:
1、设备输入电压:交流 100KV (普通试验室电源均可兼容)
1, equipment input voltage: AC 100KV (common test room power can be compatible)
2、试验电压方式:交流 0--100 KV ;直流 0--100 KV;
2. Test voltage mode: AC 0--100 KV; DC 0--100 KV;
3、电器容量:10KVA;
3, electrical capacity: 10KVA;
4、试验方法:0-100KV全量程可调;
4. Test method: the full range of 0-100KV can be adjusted.
5、击穿及耐压试验升压速率:10V/S-5KV/S
5, breakdown and pressure test boost rate: 10V/S-5KV/S
6、试验方式: 交/直流试验:1、匀速升压 2、阶梯升压 3、耐压试验
6, test mode: AC / DC test: 1, 2, speed boost step-up voltage 3, pressure test
7、过电流保护装置应有足够灵敏度以保证试样击穿时在0.1S内切断电源。
7, the overcurrent protection device should be sensitive enough to ensure that the power supply is cut off in 0.1S when the sample is broken down.
8、漏电电流选择:1—100 mA可由计算机软件自由进行设定。
8. The selection of leakage current: 1 - 100 mA can be set freely by computer software.
9、本仪器采用先进的无触点原件匀速调压方式,淘汰同类产品中机械传动升压方式。
9, this instrument adopts the advanced non-contact original uniform speed regulation mode to eliminate the mechanical drive lift mode in the same kind of product.
10、支持短时间内短路试验要求。(其它同类产品无此功能)
10, support short time short circuit test requirements. (other similar products do not have this function)
11、一次试验可以同时做5个试样。(同类产品一次试验只能做一个试样)
11. One test can make 5 samples at the same time. (one test of a similar product can only be a sample)
12、电压测量误差:≤ 2%
12, voltage measurement error is less than 2%.
13、试验电压连续可调:0-100 KV
13. The test voltage can be adjusted continuously: 0-100 KV 14、耐压时间设定: 0-6小时(可通过软件连续设定) 14, pressure time setting: 0-6 hours (can be set by software continuously) 15、九级安全防护措施: 15, nine security measures: (1)超压保护 (1) overpressure protection (2)试验过流保护 (2) test overcurrent protection (3)试验短路保护 (3) test short circuit protection (4)安全门开启保护 (4) safety door opening protection (5)软件误操作保护 (5) software misoperation protection (6)零电压复位保护 (6) zero voltage reset protection (7)试验结束放电保护 (7) the discharge protection at the end of the test (8)独立保护接地 (8) independent protection of grounding (9)试验完成后电磁放电 (9) electromagnetic discharge after experimental completion 1、绝缘试样空气中击穿或耐压试验 1. Air breakdown or pressure resistance test for insulating specimens 2、绝缘试样浸油中击穿或耐压试验 2, insulation breakdown or compressive specimen immersed in test 3、绝缘试样空气中阶梯击穿或耐压试验 3. Staircase breakdown or pressure test in air of insulated samples 4、绝缘试样浸油中阶梯击穿或耐压试验 The 4 step, the insulation breakdown or compressive specimen immersed in test 1、在试验过程中可对升压击穿过程绘制实时曲线,每次试验的升压曲线都由不同颜色构成,试验结束后可叠加对比材料的试验数据重复性。 1, during the test, the real-time curve can be drawn for the boost and breakdown process. Each step of the test is composed of different colors. After the test, the repeatability of the test data can be superimposed. 2、可以随时调取当前及历史试验数据进行查看,编辑及修改参数。 2. You can check the current and historical test data at any time, edit and modify the parameters. 3、试验过程中可以随时修改试验条件及存储路径及自动存储试验结果。 3. The test conditions, storage path and automatic storage test results can be modified at any time during the test. 4、试验过程中,可随时通过软件决定本次试验是否有效,方便筛选试验结果。 4. In the process of testing, it can be used to determine whether the test is effective at any time, and it is convenient to screen the results of the test. 5、可设置操作口令,做到专机专人操作,避免无关人员误操作。 5, the operation password can be set up, and the special machine can be operated to avoid the misoperation of the unrelated personnel. 1、试验在试验箱中进行,试验箱门打开时电源加不到高压变压器输入端,即高压侧无电压。100KV测试设备高压电极距离试验箱壁的最近距离大于270mm,50KV测试设备高压电极距离试验箱壁的最近距离大于250mm,试验时即使人接触箱壁也不会有危险。 1. The test is carried out in the test box. When the test box door opens, the power supply is not added to the input end of the high voltage transformer, that is, the high voltage side has no voltage. The closest distance between the 100KV test equipment and the high-pressure electrode distance test box wall is greater than 270mm. The closest distance between the 50KV test equipment and the test chamber wall is more than 250mm. Even when people are in contact with the wall of the test box, there will be no danger. 2、设备要安装单独的保护地线。接保护地线,主要是减少试样击穿时对周围产生的较强的电磁干扰。也可避免控制计算机失控。 2, the equipment should be equipped with a separate protective ground line. The protective ground wire is mainly to reduce the strong electromagnetic interference to the surrounding when the sample is broken down. It can also avoid controlling computer out of control. 3、该试验设备的电路设有多项保护措施,主要有:过流保护、过压保护、漏电保护、短路保护、直流试验放电报警,电磁放电等。 3, the test equipment has many protective measures, including over current protection, over voltage protection, leakage protection, short circuit protection, DC test discharge alarm, electromagnetic discharge and so on. 4、直流试验放电报警功能:在设备做完直流试验时,当开启试验门时设备会自动报警,直至使用设备上的放电装置放电后报警会自动取消.(注:因为直流试验后不放电会危险到人安全,不能直接拿取电极,起到提醒使用人员放电以免造成伤害)。 4, DC discharge test alarm function: in the equipment finished DC test, when open the door will automatically alarm test device, discharge device used on the device after discharge until the alarm will automatically be cancelled. (Note: because the DC test not put electricity risk to human safety, can not be directly taken to remind the use of electrodes. Discharge of personnel so as to avoid injury). 5、试验放电装置,电磁铁自动放电放置。 5. The test discharge device, the electromagnet is automatically discharged.
Four. Test methods:
Five. Test software:
Six. Security protection function:
产品咨询